Terminal
D, when completed will have 23 wide body swing gates, 120 ticketing
positions and a Federal Inspection Station (FIS) capable of processing
2800 passenger per hour.
ACB worked closely with Corgan Associates on the terminal design
and contract documents. Our main role was to coordinate the interior
design documents and to assist with the preparation of the contract
documents of the roof and exterior aluminum and glass facades.
|